Methodology : PH_PM005

Methodology No. PH_PM005
Sectoral scope 3. Energy demand
Title Energy Saving by Introduction Low Greenhouse Gas-Emitting Safe Drinking Water Production Systems in the Philippines
Summaries GHG emission reduction measures : The intention of the project activity involves the installation of low greenhouse gas emitting safe drinking water purifiers (SDWPs) to provide clean drinking water to the households/communities/schools/institutions (hereafter “users”). For this reason, project activity aims at reducing the wood fuel consumption of traditional stove users by distributing water purifiers to households and/or schools and/or institutions.
Calculation of reference emissions : The reference emission is calculated for each project water purifier by using the following parameters: Total quantity of water purified by the project; Fraction of functional appliances that are providing the safe drinking water; Fraction of the population served by the project activity for which the common practice of water treatment is or would have been water boiling; Specific energy consumption required to boil one litre of water; Proportions of reference fuel (NRB and/or fossil fuels) used in the absence of the project activity; Fraction of non-renewable fuel used in the absence of the project activity; Emission factor of the fuel substituted
Calculation of project emissions : The project emission is calculated for each project water purifier by using the following parameters: Emissions from fossil fuel combustion; Emissions from electricity consumption
Monitoring parameters : Number of population who consumes the purified water serviced by the project activity; Quantity of purified water; Fraction of functional appliances that are providing the safe drinking water; Usage time; Check for SDW public distribution network; Quality of safe drinking water; Date of commissioning of the project device
Status Proposed methodology rejected
Methodology Proponent Tokyo Carbon Management Ltd (TCM)
Proposed Methodology
Public inputs
  • 02 Sep 24   -  16 Sep 24