Rules and Guidelines

[Download All Rules and Guidelines(zip:1.33MB)] [Download All forms(zip:0.73MB)]
Category Rules and Guidelines Forms
General Bilateral Document
histories
Modification of Bilateral Document (as of 10 April 2018)
Rules of Implementation ver03.0
histories
Glossary of Terms ver01.0
histories
Common Specifications of the JCM Registry ver01.0
Project Cycle Project Cycle Procedure ver02.0
histories
Guidelines for Developing Proposed Methodology ver01.0
histories
Guidelines for Developing Project Design Document and Monitoring Report ver03.0
histories
Third-Party Entity (TPE) Guidelines for Designation as a Third-Party Entity ver02.0
histories
Guidelines for Validation and Verification ver01.0
histories
Joint Committee (JC) Rules of Procedures for the Joint Committee ver01.0
histories

*NOTE:
Where a submission including a proposed methodology, PDD and accompanying additional/supporting documents contains information that the methodology proponents or project participants wish to be treated as confidential or proprietary, those entities are required to submit documentation in two versions:
(a) One version where all parts containing confidential or proprietary information are made illegible (e.g. by covering those parts with black ink or overwrite those parts with letters such as “XXX”) so that the version can be made publicly available without displaying confidential or proprietary information;
(b) Another version containing all information that is to be treated as strictly confidential or proprietary by all parties handling this documentation (the third-party entities, the Joint Committee members, external experts).