JC Decision

Decision Date
Decision by the Joint Committee (Electronic Decision) 23 Feb 20
Registration of a proposed JCM project
- CR001 “5MW Solar Power Project in Belen”
Designation of a third-party entity (TPE)
- EPIC Sustainability Services Private Limited (EPIC)
Decision by the Joint Committee 10 Apr 18
Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 03.0)
JCM Guidelines for Developing Project Design Document and Monitoring Report (version 03.0)
JCM Verification Report Form (version 02.0)
JCM Credits Issuance Request Form (version 03.0)
Decision by the Joint Committee (Electronic Decision) 12 Mar 18
Approval of proposed methodologies with revisions:
CR_AM002 "Energy Saving by Introduction of High Efficiency Centrifugal Chiller"
CR_AM003 "Installation of Electric Heat Pump Type Water Heater for Hot Water Supply Systems"
2nd Joint Committee in San Jose 08 Sep 17
Meeting Report
Annex 1: Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 02.0)
Annex 2: JCM Project Cycle Procedure (version 02.0)
Annex 3: JCM Credits Issuance Request Form (version 02.0)
Annex 4: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 02.0)
Annex 5: JCM Guidelines for Designation as a Third-Party Entity (version 02.0)
Annex 6: Common Specifications of the JCM Registry
Annex 7: CR_AM001 “Installation of Solar PV System”
Annex 8: CR_PM002 “Energy Saving by Introduction of High Efficiency Centrifugal Chiller”
Annex 9: CR_PM003 “Installation of Electric heat pumps for Hot Water Supply Systems”
Designation of a TPE for additional sectoral scopes of 1, 2 and 3 for verification
- Japan Management Association
Decision by the Joint Committee (Electronic Decision) 17 Jun 16
Designation of third-party entities:
- Japan Management Association
- Japan Quality Assurance Organization
Decision by the Joint Committee (Electronic Decision) 08 Apr 16
Designation of third-party entities:
- Lloyd's Register Quality Assurance Limited (LRQA)
1st Joint Committee in San Jose 29 Sep 15
Meeting Report
Annex 1: Joint Crediting Mechanism Rules of Procedures for the Joint Committee
Annex 2: Rules of Implementation for the Joint Crediting Mechanism (JCM)
Annex 3: Joint Crediting Mechanism Project Cycle Procedure
Annex 3.1. JCM Modalities of Communication Statement Form
Annex 3.2. JCM Validation Report Form
Annex 3.3. JCM Project Registration Request Form
Annex 3.4. JCM Verification Report Form
Annex 3.5. JCM Credits Issuance Request Form
Annex 3.6. JCM Approved Methodology Revision Request Form
Annex 3.7. JCM Post-Registration Changes Request Form
Annex 3.8. JCM Project Withdrawal Request Form
Annex 3.9. JCM Registration Request Withdrawal Form
Annex 3.10. JCM Issuance Request Withdrawal Form
Annex 4: Joint Crediting Mechanism Guidelines for Developing Proposed Methodology
Annex 5: Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report
Annex 6: Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity
Annex 7: Joint Crediting Mechanism Guidelines for Validation and Verification
Annex 8: Joint Crediting Mechanism Glossary of Terms