Decision by the Joint Committee (Electronic Decision) |
23 Feb 20 |
Registration of a proposed JCM project
|
|
- CR001 “5MW Solar Power Project in Belen”
|
|
Designation of a third-party entity (TPE)
|
|
- EPIC Sustainability Services Private Limited (EPIC)
|
|
Decision by the Joint Committee |
10 Apr 18 |
Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 03.0)
|
|
JCM Guidelines for Developing Project Design Document and Monitoring Report (version 03.0)
|
|
JCM Verification Report Form (version 02.0)
|
|
JCM Credits Issuance Request Form (version 03.0)
|
|
Decision by the Joint Committee (Electronic Decision) |
12 Mar 18 |
Approval of proposed methodologies with revisions:
|
|
CR_AM002 "Energy Saving by Introduction of High Efficiency Centrifugal Chiller"
|
|
CR_AM003 "Installation of Electric Heat Pump Type Water Heater for Hot Water Supply Systems"
|
|
2nd Joint Committee in San Jose |
08 Sep 17 |
Meeting Report
|
|
Annex 1: Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 02.0)
|
|
Annex 2: JCM Project Cycle Procedure (version 02.0)
|
|
Annex 3: JCM Credits Issuance Request Form (version 02.0)
|
|
Annex 4: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 02.0)
|
|
Annex 5: JCM Guidelines for Designation as a Third-Party Entity (version 02.0)
|
|
Annex 6: Common Specifications of the JCM Registry
|
|
Annex 7: CR_AM001 “Installation of Solar PV System”
|
|
Annex 8: CR_PM002 “Energy Saving by Introduction of High Efficiency Centrifugal Chiller”
|
|
Annex 9: CR_PM003 “Installation of Electric heat pumps for Hot Water Supply Systems”
|
|
Designation of a TPE for additional sectoral scopes of 1, 2 and 3 for verification
|
|
- Japan Management Association
|
|
Decision by the Joint Committee (Electronic Decision) |
17 Jun 16 |
Designation of third-party entities:
|
|
- Japan Management Association
|
|
- Japan Quality Assurance Organization
|
|
Decision by the Joint Committee (Electronic Decision) |
08 Apr 16 |
Designation of third-party entities:
|
|
- Lloyd's Register Quality Assurance Limited (LRQA)
|
|
1st Joint Committee in San Jose |
29 Sep 15 |
Meeting Report
|
|
Annex 1: Joint Crediting Mechanism Rules of Procedures for the Joint Committee
|
|
Annex 2: Rules of Implementation for the Joint Crediting Mechanism (JCM)
|
|
Annex 3: Joint Crediting Mechanism Project Cycle Procedure
|
|
Annex 3.1. JCM Modalities of Communication Statement Form
|
|
Annex 3.2. JCM Validation Report Form
|
|
Annex 3.3. JCM Project Registration Request Form
|
|
Annex 3.4. JCM Verification Report Form
|
|
Annex 3.5. JCM Credits Issuance Request Form
|
|
Annex 3.6. JCM Approved Methodology Revision Request Form
|
|
Annex 3.7. JCM Post-Registration Changes Request Form
|
|
Annex 3.8. JCM Project Withdrawal Request Form
|
|
Annex 3.9. JCM Registration Request Withdrawal Form
|
|
Annex 3.10. JCM Issuance Request Withdrawal Form
|
|
Annex 4: Joint Crediting Mechanism Guidelines for Developing Proposed Methodology
|
|
Annex 5: Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report
|
|
Annex 6: Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity
|
|
Annex 7: Joint Crediting Mechanism Guidelines for Validation and Verification
|
|
Annex 8: Joint Crediting Mechanism Glossary of Terms
|
|