Electronic Decision by the JC |
23 Feb 20 |
Call for public inputs on a proposed JCM project (Costa Rica) “Introduction of High Efficiency Centrifugal Chiller and Electric Heat Pump Type Water Heater in Hotel” (14 February to 14 March 2020) |
14 Feb 20 |
Call for public inputs on a proposed JCM project (Costa Rica) “5MW Solar Power Project in Belen” (29 August to 27 September 2018) |
29 Aug 18 |
Decision by the JC |
10 Apr 18 |
Electronic Decision by the JC |
12 Mar 18 |
Call for public inputs on JCM proposed methodologies (Costa Rica) “Energy Saving by Introduction of High Efficiency Centrifugal Chiller” and “Installation of Electric Heat Pump Type Water Heater for Hot Water Supply Systems” (20 September to 4 October 2017) |
20 Sep 17 |
2nd Joint Committee in San Jose |
08 Sep 17 |
Call for public inputs on a JCM proposed methodology (Costa Rica) “Installation of Solar PV System” (19 August to 2 September 2017) |
19 Aug 17 |
Electronic Decision by the JC |
17 Jun 16 |
Electronic Decision by the JC |
08 Apr 16 |
1st Joint Committee in San Jose |
29 Sep 15 |
Japan and the Republic of Costa Rica signed the bilateral document to start JCM |
09 Dec 13 |