The Joint Committee adopted the decision on proposed JCM projects and a third party entity by electronic means.
Registration of proposed JCM projects
- BD003 “Installation of High Efficiency Loom at Weaving Factory”
- BD004 “Introduction of PV-diesel Hybrid System at Fastening Manufacturing Plant”
Designation of a TPE for an additional sectoral scopes of 12 for validation and verification
- EPIC Sustainability Services Private Limited (EPIC)