Project title |
Introduction of 0.8MW Solar Power System to Aluminum Products, Packaging Materials and Automotive Parts Factories Ref No. PH007 PDD form Monitoring plan |
---|---|
Name of project participants (Philippines) | DAIKI OM ALUMINIUM INDUSTRY (PHILIPPINES), INC.; FUJISASH PHILIPPINES, INC.; HKT PHILIPPINES, INC.; KANEPACKAGE PHILIPPINE, INC.; BPI Century Tokyo Rental Corporation |
Name of project participants (Japan) | Tokyo Century Corporation |
Name of third party entity (TPE) | TPE-PH-002 EPIC Sustainability Services Private Limited (EPIC) |
Location of project |
Country: The Republic of the Philippines Region/State/Province etc: Site 1: Cavite, Philippines; Site 2: Cavite, Philippines; Site 3: Laguna, Philippines; Site 4: Laguna, Philippines; Site 5: Batangas, Philippines City/Town/Community etc: Site 1: Lot5, Block21, Phase Ⅲ, Cavite Economic Zone Rosario, 4106; Site 2: Blk. 7 Lot 10-13, Phase 2, First Cavite Industrial Estate - Sez Langkaan, Dasmarinas City, 4126; Site 3: Lot C2-1A, Carmelray Industrial Park Ⅱ, Barangay Punta, Calamba City Site 4: No.5, Ring Road, Light Industry Science Park I, Barangay, Lamesa, Calamba City; Site 5: Block 6 Lot 2&3, Phase 3, Lima Technology Center, Malvar Latitude, longitude: Site 1: N14.418270 E120.857700; Site 2: N14.279164 E120.931465; Site 3: N33.675030 E117.353248; Site 4: N14.227450 E121.112030; Site 5: N14.008551969541983 E121.16604264044145 |
Duration |
Starting date of project operation: 30 Jul 22 Expected operational lifetime of project: 6 years |
Methodology No. | |
Emission Reductions (tCO2e) |
Estimated emission reductions in each year
|
Status | Validation |