Total methodologies found:4
| Methodology No. | Host country | Title | Status | Latest version | Date of approval | Proposed Methodology No. | Methodology Proponent | ||
|---|---|---|---|---|---|---|---|---|---|
| MN_AM004 | Mongolia | Installation of solar photovoltaic system and battery energy storage system | Approved | Ver1.0 | 20 Dec 24 | MN_PM006 | Pacific Consultants Co., Ltd. | 20240731 | 20240814 |
| MN_AM003 | Mongolia | Installation of Solar PV System | Approved | Ver3.0 | 04 Aug 24 | MN_PM005 MN_PM004 MN_PM003 |
The Joint Committee | 20240523 | 20240606 |
| MN_AM002 | Mongolia | Replacement and Installation of High Efficiency Heat Only Boiler (HOB) for Hot Water Supply Systems | Approved | Ver1.0 | 28 Jan 15 | MN_PM002 | Suuri-Keikaku CO., LTD., Climate Experts LTD. | 20141118 | 20141202 |
| MN_AM001 | Mongolia | Installation of energy-saving transmission lines in the Mongolian Grid | Approved | Ver1.0 | 20 Feb 14 | MN_PM001 | Hitachi, Ltd. | 20140204 | 20140218 |