| Category | Rules and Guidelines | Forms |
|---|---|---|
| General | Bilateral Document | |
| Rules of Implementation | ||
| Common Specifications of the JCM Registry | ||
| Project Cycle | Project Cycle Procedure
ver01.0 histories |
|
Guidelines for
Developing Proposed Methodology ver01.0 histories |
|
|
Guidelines for
Developing Project Design Document and Monitoring Report ver01.0 histories |
|
|
| Guidelines for Developing Sustainable Development Implementation Plan and Report ver01.0 |
|
|
| Third-Party Entity (TPE) | Guidelines for
Designation as a Third-Party Entity ver01.0 histories |
|
Guidelines for
Validation and Verification ver01.0 histories |
|
|
| Joint Committee (JC) | Rules of Procedures
for the Joint Committee ver01.0 histories |
|
*NOTE:
Where a submission including a proposed methodology, PDD and accompanying additional/supporting documents contains
information that the methodology proponents or project participants wish to be treated as confidential or
proprietary, those entities are required to submit documentation in two versions:
(a) One version where all parts containing confidential or proprietary information are made illegible (e.g. by
covering those parts with black ink or overwrite those parts with letters such as “XXX”) so that the version can be
made publicly available without displaying confidential or proprietary information;
(b) Another version containing all information that is to be treated as strictly confidential or proprietary by all
parties handling this documentation (the third-party entities, the Joint Committee members, external experts).