| 7th Joint Committee in Phnom Penh and Online |
05 Mar 26 |
|
Rules and Guidelines adopted at the meeting:
|
|
|
Joint Crediting Mechanism Rules and Guidelines between the Kingdom of Cambodia and Japan
|
|
|
Rules and Guidelines for REDD-plus and Afforestation/Reforestation adopted at the meeting:
|
|
|
JCM Guidelines for Developing Proposed Methodology for REDD-plus and Afforestation/Reforestation
|
|
|
JCM Project Cycle Procedure for REDD-plus and Afforestation/Reforestation
|
|
|
JCM Guidelines for Developing Project Design Document and Monitoring Report for REDD-plus and Afforestation/Reforestation
|
|
|
JCM Guidelines for Addressing and Respecting Safeguards for REDD-plus and Afforestation/Reforestation
|
|
|
JCM Guidelines for Validation and Verification for REDD-plus and Afforestation/Reforestation
|
|
|
Decision on no objection to the planned project:
|
|
|
- KH_PIN001 "Methane gas reduction project in Battambang Province through AWD (Alternate Wetting and Drying) implementation in rice paddies"
|
|
|
Approval of a proposed methodology:
|
|
|
- KH_AM006 "Energy Saving by Introduction of High Efficiency Firewood Cookstove to Replace Traditional Cookstove"
|
|
|
Decision on issuance of credits:
|
|
|
- KH002 "Introduction of High Efficiency LED Lighting Utilizing Wireless Network" for the monitoring period of 01 Jan 2018 to 31 Dec 2020
|
|
|
Designation of a Third-Party Entity:
|
|
|
- Earthood Services Limited
|
|
| 6th Joint Committee in Phnom Penh and Online |
22 Dec 23 |
| Meeting Report |
|
| Decision on issuance of credits: |
|
| - KH005 “Prey Lang Wildlife Sanctuary - Stung Treng REDD+ project” for the monitoring period of 12 Mar 18 - 31 Dec 20 |
|
| Designation of third-party entities: |
|
| - Enviance Services Private Limited |
|
| - Ampere For Renewable Energy |
|
| Electronic Decision by the JC |
09 Jun 23 |
| Registration of proposed JCM projects: |
|
| - KH004 "Energy Saving by Inverters for Distribution Pumps in Water Treatment Plant" |
|
| - KH005 "Prey Lang Wildlife Sanctuary - Stung Treng REDD+ project" |
|
| Designation of third-party entities: |
|
| - Lloyd’s Register Quality Assurance Limited (based on their new accreditation under the ISO 14065) |
|
| - LGAI Technological Center S.A. (Applus+ Certification) |
|
| - Korean Standards Association |
|
| Electronic Decision by the JC |
27 Feb 21 |
| Approval of revised methodology: |
|
| KH_AM004 (ver01.1) "Reducing deforestation and forest degradation through forest conservation in Cambodia" |
|
| Designation of third-party entities: |
|
| - Scientific Certification Systems, Inc., DBA SCS Global Services |
|
| - Aster Global Environmental Solutions, Inc. (Aster Global) |
|
| Electronic Decision by the JC |
29 Jun 20 |
| Joint Crediting Mechanism Rules of Procedures for the Joint Committee (version 02.0) |
|
| 5th Joint Committee in Phnom Penh |
21 Feb 20 |
| Meeting Report |
|
| Annex 1: JCM Validation Report Form for REDD-plus (version 01.0) |
|
| Annex 2: JCM Verification Report Form for REDD-plus (version 01.0) |
|
| Annex 3: Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 04.1) |
|
| Annex 4: KH_AM003 “Introduction of High Efficiency Centrifugal Chiller” |
|
| Annex 5: KH_AM004 “Reducing deforestation and forest degradation through forest conservation in Cambodia” |
|
| Annex 6: KH_AM005 “Installation of inverters to distribution pumps in water treatment plant” |
|
| Registration of a proposed JCM project: |
|
| - KH002 "Introduction of High Efficiency LED Lighting Utilizing Wireless Network" |
|
| Decision on issuance of credits: |
|
| - KH001 “Introduction of Ultra-lightweight Solar Panels for Power Generation at International School” for the monitoring period of 01 Aug 16 - 31 Jul 18 |
|
| Designation of a TPE for an additional sectoral scope: |
|
| - EPIC Sustainability Services Private Limited (EPIC) |
|
| Decision on change in designation status of a TPE: |
|
| - Lloyd’s Register Quality Assurance Limited (LRQA) |
|
| 4th Joint Committee in Phnom Penh |
30 May 18 |
| Meeting Report |
|
| Annex 1: Rules of Implementation for the JCM (version 04.0) |
|
| Annex 2: JCM Project Cycle Procedure for REDD-plus (version 01.0) |
|
| Annex 3: JCM Guidelines for Developing Proposed Methodology for REDD-plus (version 01.0) |
|
| Annex 4: JCM Guidelines for Developing Project Design Document and Monitoring Report for REDD-plus (version 01.0) |
|
| Annex 5: JCM Guidelines for Addressing and Respecting Safeguards for REDD-plus (version 01.0) |
|
| Annex 6: JCM Guidelines for Validation and Verification for REDD-plus (version 01.0) |
|
| Annex 7: JCM Glossary of Terms (version 02.0) |
|
| Annex 8: JCM Modalities of Communication Statement Form for REDD-plus (version 01.0) |
|
| Annex 9: JCM Guidelines for Developing Proposed Methodology (version 03.0) |
|
| Annex 10: JCM Guidelines for Designation as a Third-Party Entity (version 03.0) |
|
| Electronic Decision by the JC |
12 Mar 18 |
| Registration of a proposed JCM project: |
|
| - KH001 “Introduction of Ultra-lightweight Solar Panels for Power Generation at International School” |
|
| 3rd Joint Committee in Phnom Penh |
15 Sep 17 |
| Meeting Report |
|
| Annex 1: Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 03.0) |
|
| Annex 2: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 03.0) |
|
| Annex 3: JCM Verification Report Form (version 02.0) |
|
| Annex 4: JCM Credits Issuance Request Form (version 03.0) |
|
| Annex 5: JCM Project Cycle Procedure (version 03.0) |
|
| Designation of a TPE for additional sectoral scopes of 1, 2 and 3 for verification |
|
| - Japan Management Association |
|
| Electronic Decision by the JC |
04 Feb 17 |
| Approval of a proposed methodology with revisions: |
|
| KH_AM002 "Installation of Solar PV System" |
|
| 2nd Joint Committee in Phnom Penh |
26 Apr 16 |
| Meeting Report |
|
| Annex 1: Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 02.0) |
|
| Annex 2: JCM Project Cycle Procedures (version 02.0) |
|
| Annex 2.1. JCM Credits Issuance Request Form (version 02.0) |
|
| Annex 3: JCM Guidelines for Developing Proposed Methodology (version 02.0) |
|
| Annex 4: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 02.0) |
|
| Annex 5: JCM Guidelines for Designation as a Third-Party Entity (version 02.0) |
|
| Annex 6: Common Specifications of the JCM Registry |
|
| Annex 7: KH_AM001 “Installation of LED street lighting system with wireless network control” |
|
| Electronic Decision by the JC |
21 Apr 16 |
| Designation of third-party entities: |
|
| - EPIC Sustainability Services Private Limited (EPIC) |
|
| - Japan Management Association |
|
| - Deloitte Tohmatsu Evaluation and Certification Organization (Deloitte-TECO) |
|
| - Bureau Veritas Certification Holding SAS |
|
| Electronic Decision by the JC |
03 May 15 |
| Designation of third-party entities: |
|
| - KBS Certification Services Pvt. Ltd. (KBS) |
|
| - Lloyd's Register Quality Assurance Limited (LRQA) |
|
| - Japan Quality Assurance Organization (JQA) |
|
| 1st Joint Committee in Phnom Penh |
16 Jan 15 |
| Meeting Report |
|
| Annex 1: Joint Crediting Mechanism Rules of Procedures for the Joint Committee |
|
| Annex 2: Rules of Implementation for the Joint Crediting Mechanism (JCM) |
|
| Annex 3: Joint Crediting Mechanism Project Cycle Procedure |
|
| Annex 3.1. JCM Modalities of Communication Statement Form |
|
| Annex 3.2. JCM Validation Report Form |
|
| Annex 3.3. JCM Project Registration Request Form |
|
| Annex 3.4. JCM Verification Report Form |
|
| Annex 3.5. JCM Credits Issuance Request Form |
|
| Annex 3.6. JCM Approved Methodology Revision Request Form |
|
| Annex 3.7. JCM Post-Registration Changes Request Form |
|
| Annex 3.8. JCM Project Withdrawal Request Form |
|
| Annex 3.9. JCM Registration Request Withdrawal Form |
|
| Annex 3.10. JCM Issuance Request Withdrawal Form |
|
| Annex 4: Joint Crediting Mechanism Guidelines for Developing Proposed Methodology |
|
| Annex 5: Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report |
|
| Annex 6: Joint Crediting Mechanism Guidelines for Designation of a Third-Party Entity |
|
| Annex 7: Joint Crediting Mechanism Guidelines for Validation and Verification |
|
| Annex 8: Joint Crediting Mechanism Glossary of Terms |
|