Electronic Decision by the JC |
25 Jan 21 |
4th Joint Committee in Addis Ababa |
30 Jan 20 |
3rd Joint Committee in Addis Ababa |
21 Mar 17 |
Call for public inputs on a JCM proposed methodology “Introduction of Biomass Combined Heat and Power Plant” (24 February 2017 to 10 March 2017) |
24 Feb 17 |
Call for public inputs on a JCM proposed methodology “Electrification by photovoltaic power generation in Ethiopia” (11 January 2017 to 25 January 2017) |
11 Jan 17 |
Electronic Decision by the JC |
03 Apr 16 |
Decision by the JC |
14 Mar 16 |
Call for public inputs on a JCM proposed methodology “Electrification of communities using Micro hydropower generation” (10 February to 24 February 2016) |
10 Feb 16 |
2nd Joint Committee in Addis Ababa |
05 Feb 16 |
Electronic Decision by the JC |
19 Mar 14 |
Electronic Decision by the JC |
12 Dec 13 |
Electronic Decision by the JC |
05 Dec 13 |
1st Joint Committee in Addis Ababa |
19 Aug 13 |
Japan and Ethiopia signed the bilateral document to start JCM |
27 May 13 |