The 2nd Joint Committee of the Joint Crediting Mechanism between the Lao People’s Democratic Republic and Japan was held in Vientiane.
Meeting Report
Annex 1: Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 02.0)
Annex 2: JCM Project Cycle Procedure (version 02.0)
Annex 2.1: JCM Credits Issuance Request Form (version 02.0)
Annex 3: Joint Crediting Mechanism Rules of Procedures for the Joint Committee (version 02.0)
Annex 4: JCM Guidelines for Developing Proposed Methodology (version 01.1)
Annex 5: JCM Guidelines for Developing Project Design Document and Monitoring Report (version 02.0)
Annex 6: JCM Guidelines for Designation as a Third-Party Entity (version 02.0)
Annex 7: Common Specifications of the JCM Registry
Annex 8: LA_AM001 “Installation and operation of energy-efficient data center (DC) in the Lao PDR”