Electronic Decision by the JC |
21 Dec 23 |
Call for public inputs on a proposed JCM project (Laos) “REDD+ project in Luang Prabang Province through controlling shifting cultivation” (19 October to 17 November 2023) |
19 Oct 23 |
Electronic Decision by the JC |
24 May 23 |
Electronic Decision by the JC |
07 Apr 23 |
Call for public inputs on proposed JCM project (Laos) “Introduction of Amorphous high efficiency transformers in power distribution systems” (8 December 2022 to 6 January 2023) |
08 Dec 22 |
Electronic Decision by the JC |
05 Aug 22 |
Electronic Decision by the JC |
22 Jun 22 |
Electronic Decision by the JC |
23 Mar 22 |
Call for public inputs on JCM proposed methodology “Reducing GHG emissions from deforestation and forest degradation through controlling shifting cultivation in Phonxay District, Luang Prabang Province of Lao PDR” (Laos) (20 January to 3 February 2022) |
20 Jan 22 |
Call for public inputs on a proposed JCM project (Laos) “Introduction of 11MW Solar Power Project in Savannakhet Province” (14 December 2021 to 12 January 2022) |
14 Dec 21 |
Call for public inputs on a proposed JCM project (Laos) “Introduction of 14MW floating solar power system in Vientiane” (15 September to 14 October 2021) |
15 Sep 21 |
Electronic Decision by the JC |
17 Oct 19 |
Electronic Decision by the JC |
11 Mar 19 |
Electronic Decision by the JC |
18 Jan 19 |
4th Joint Committee in Vientiane |
10 Aug 18 |
Call for public inputs on JCM proposed methodology “Installation of energy efficient transformers in a power distribution grid” (Laos) (25 July to 8 August 2018) |
25 Jul 18 |
Call for public inputs on JCM proposed methodology “Installation of Solar PV System” (Laos) (6 July to 20 July 2018) |
06 Jul 18 |
Electronic Decision by the JC |
19 Oct 17 |
3rd Joint Committee in Vientiane |
31 Jul 17 |
Call for public inputs on a proposed JCM project (Laos) “Lao PDR Energy Efficient Datacenter Project (LEED)” (27 December 2016 to 25 January 2017) |
27 Dec 16 |