JC Decision

Decision Date
Decision by the Joint Committee (Electronic Decision) 26 Jan 24
Designation of third-party entities:
- LGAI Technological Center S.A. (Applus+ Certification)
- Enviance Services Private Limited
- Ampere For Renewable Energy
Decision by the Joint Committee (Electronic Decision) 07 Feb 21
Decision on issuance of credits:
- KE002 "Introduction of Solar PV System at Salt Factory" for the monitoring period of 14 Dec 16 – 31 Dec 18
4th Joint Committee in Nairobi 27 Jan 20
Meeting Report
Registration of proposed JCM projects:
- KE001 "Electrification of communities using Ultra Low Head Micro Hydro Power Generation system"
- KE002 "Introduction of Solar PV System at Salt Factory"
Designation of TPE for additional sectoral scopes:
- Japan Management Association
- EPIC Sustainability Services Private Limited (EPIC)
Decision by the Joint Committee (Electronic Decision) 10 Sep 17
Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 03.0)
JCM Guidelines for Developing Project Design Document and Monitoring Report (version 03.0)
Common Specifications of the JCM Registry
3rd Joint Committee in Nairobi 23 Mar 17
Meeting Report
Annex 1: JCM Verification Report Form (version 02.0)
Annex 2: JCM Credits Issuance Request Form (version 02.0)
Annex 3: JCM Project Cycle Procedure (version 03.0)
Annex 4: KE_AM002 “Installation of Solar PV System”
Annex 5: KE_AM003 “Installation of Run-of-river Small Hydropower Generation Plant”
2nd Joint Committee in Nairobi 03 Feb 16
Meeting Report
Annex 1 Rules of Procedures for the Joint Committee (version 02.0)
Annex 2 Rules of Implementation for the Joint Crediting Mechanism (JCM) (version 02.0)
Annex 3 Joint Crediting Mechanism Project Cycle Procedure (version 02.0)
Annex 3.1 JCM Modalities of Communication Statement Form
Annex 3.2 JCM Validation Report Form
Annex 3.3 JCM Project Registration Request Form
Annex 3.4 JCM Verification Report Form
Annex 3.5 JCM Credits Issuance Request Form
Annex 3.6 JCM Approved Methodology Revision Request Form
Annex 3.7 JCM Post-Registration Changes Request Form
Annex 3.8 JCM Project Withdrawal Request Form
Annex 3.9 JCM Registration Request Withdrawal Form
Annex 3.10 JCM Issuance Request Withdrawal Form
Annex 4 JCM Guidelines for Developing Proposed Methodology (version 02.0)
Annex 5 JCM Guidelines for Developing Project Design Document and Monitoring Report (version 02.0)
Annex 6 JCM Guidelines for Designation as a Third Party Entity (version 02.0)
Annex 7 KE_AM001 “Electrification of communities using Micro hydropower generation”
Decision by the Joint Committee (Electronic Decision) 14 Sep 15
Designation of third-party entities:
- ERM Certification and Verification Services Limited (ERM CVS)
Decision by the Joint Committee (Electronic Decision) 22 Apr 15
Designation of third-party entities:
- EPIC Sustainability Services Private Limited (EPIC)
Decision by the Joint Committee (Electronic Decision) 30 Sep 14
Designation of third-party entities:
- TUV Rheinland (China) Ltd
Decision by the Joint Committee (Electronic Decision) 12 Jun 14
Designation of third-party entities:
- Japan Quality Assurance Organization
- JACO CDM., LTD
- Lloyd's Register Quality Assurance Limited
- KBS Certification Services Pvt. Ltd.
- Japan Management Association
1st Joint Committee in Nairobi 23 Aug 13
Meeting report
Annex 1: Joint Crediting Mechanism Rules of Procedures for the Joint Committee
Annex 2: Rules of Implementation for the Joint Crediting Mechanism (JCM)
Annex 3: Joint Crediting Mechanism Project Cycle Procedure
Annex 4: Joint Crediting Mechanism Guidelines for Developing Proposed Methodology
Annex 5: Joint Crediting Mechanism Guidelines for Developing Project Design Document and Monitoring Report
Annex 6: Joint Crediting Mechanism Guidelines for Designation of a Third-Party Entity
Annex 7: Joint Crediting Mechanism Guidelines for Validation and Verification
Annex 8: Joint Crediting Mechanism Glossary of Terms