| Japan and Viet Nam signed a Memorandum of Cooperation |
02 May 26 |
| Call for public inputs on proposed JCM projects "Introduction of 2.5MW Rooftop Solar Power System to Food Factory and Garment Factory in Vietnam" and "Introduction of 0.4MW Rooftop Solar Power System to Aluminum Wheel Manufacturing Factory in Hanoi, Vietnam" (Viet Nam) (20 January to 18 February 2025) |
20 Jan 25 |
| 9th Joint Committee in Hanoi and Online |
31 Oct 24 |
| Call for public inputs on JCM proposed methodologies "Introduction of Biomass Boiler" and "Introduction of Biomass Cogeneration System" (Viet Nam) (20 August to 3 September 2022) |
20 Aug 22 |
| Call for public inputs on a JCM proposed methodology "Introduction of HFCs destruction facilities in Viet Nam" (Viet Nam) (9 to 23 June 2022) |
09 Jun 22 |
| Call for public inputs on a JCM proposed methodology "Modal shift from truck to cargo ship with freshness preservation reefer container" (Viet Nam) (21 April to 5 May 2022) |
21 Apr 22 |
| Call for public inputs on a proposed JCM project (Viet Nam) "106MW Solar Power Project in An Giang Province" and "Introduction of Amorphous High Efficiency Transformers in Northern, Central and Southern Power Grids II" (25 January to 23 February 2022) |
25 Jan 22 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Installation of High Efficiency Kiln in Sanitary Ware Manufacturing Factory” (4 February to 4 March 2020) |
04 Feb 20 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Energy Saving in Factories with Air-Conditioning Control System” (2 November to 1 December 2019) |
02 Nov 19 |
| Electronic Decision by the JC |
11 Oct 19 |
| Call for public inputs on JCM proposed methodologies "Introduction of Non-Inverter Type High Efficiency Centrifugal Chiller", "Energy Saving by Introduction of High Efficiency Boiler", "Energy Saving by Introduction of High-efficiency Inverter Type Multi-Stage Oil-Free Air Compressor" and "Energy Saving by Introduction of High Efficiency Screw Chiller(s)" (Viet Nam) (3 to 17 October 2019) |
03 Oct 19 |
| Electronic Decision by the JC |
19 Jul 19 |
| 8th Joint Committee in Hanoi |
28 May 19 |
| Call for public inputs on JCM proposed methodology “Installation of compressor control system(s) for split type air conditioner(s)” (Viet Nam) (16 February to 2 March 2019) |
16 Feb 19 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of high-efficient wire stranding machines to the factory of YAZAKI EDS VIETNAM Co., LTD.” (5 February to 6 March 2019) |
05 Feb 19 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of Amorphous High Efficiency Transformers in Northern, Central and Southern Power Grids” (24 January to 22 February 2019) |
24 Jan 19 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of High Efficiency Water Pumps in Da Nang City” (4 December 2018 to 2 January 2019) |
04 Dec 18 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Installation of Energy Saving Equipment in Lens Factory” (21 November to 20 December 2018) |
21 Nov 18 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Installation of Container Formation Facility at Lead Acid Battery Factory of Hitachi Chemical Energy Technology (Vietnam) Co., Ltd.” (20 September to 19 October 2018) |
20 Sep 18 |
| Decision by the JC |
29 Aug 18 |
| 7th Joint Committee in Hanoi |
15 Aug 18 |
| Call for public inputs on JCM proposed methodologies "Introduction of tunnel and/or shuttle kiln with waste heat recovery system", "Energy Saving by Introduction of High Efficiency Inverter Type Centrifugal Chiller", "Energy Saving by Introduction of Heat Recovery Electric Heat Pump", "Energy saving by introduction of high-efficiency double suction volute pumps in water supply system" and "Introduction of energy efficient wire stranding machines to automotive wire production factory" (Viet Nam) (14 to 28 August 2018) |
14 Aug 18 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of Energy-Efficient Air Conditioners in RICOH IMAGING PRODUCTS (Vietnam) CO., LTD” (16 December 2017 to 14 January 2018) |
16 Dec 17 |
| Call for public inputs on proposed JCM projects (Viet Nam) “Introduction of Solar PV System at shopping mall in Ho Chi Minh” and “Introduction of Amorphous High Efficiency Transformers in Southern and Central Power Grids” (8 December 2017 to 6 January 2018) |
08 Dec 17 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Energy saving and work efficiency improvement by introducing a new chip-on-board LED system in Vietnam” (18 November to 17 December 2017) |
18 Nov 17 |
| 6th Joint Committee in Hanoi |
10 Oct 17 |
| Call for public inputs on a JCM proposed methodology (Viet Nam) “Installation of Container Formation Facility at Acid Lead Battery Factory” (13 June to 27 June 2017) |
13 Jun 17 |
| Call for public inputs on a JCM proposed methodology “Installation of LED lighting equipment to fishing boats” (2 June to 16 June 2017) |
02 Jun 17 |
| Electronic Decision by the JC |
24 Feb 17 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of High Efficiency Air-conditioning in Hotel” (18 February 2017 to 19 March 2017) |
18 Feb 17 |
| 5th Joint Committee in Hanoi |
20 Oct 16 |
| Call for public inputs on a JCM proposed methodology “Installation of Solar PV System” (4 October to 18 October 2016) |
04 Oct 16 |
| Call for public inputs on a JCM proposed methodology “Introduction of air conditioning system equipped with inverters” (17 August to 31 August 2016) |
17 Aug 16 |
| Call for public inputs on proposed revisions to the approved methodology VN_AM001 “Transportation energy efficiency activities by installing digital tachograph systems” (29 July to 12 August 2016) |
29 Jul 16 |
| Electronic Decision by the JC |
15 May 16 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of amorphous high efficiency transformers in power distribution systems in the southern part of Viet Nam” (19 February to 19 March 2016) |
19 Feb 16 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Low carbon hotel project in Vietnam: Improving the energy efficiency of commercial buildings by utilization of high efficiency equipment” (5 December 2015 to 3 January 2016) |
05 Dec 15 |
| Electronic Decision by the JC |
30 Nov 15 |
| Decision by the JC |
03 Sep 15 |
| 4th Joint Committee in Hanoi |
04 Aug 15 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Promotion of green hospitals by improving efficiency / environment in national hospitals in Vietnam” (24 July to 22 August 2015) |
24 Jul 15 |
| Call for public inputs on JCM proposed methodologies “Anaerobic digestion of organic waste for biogas utilization within wholesale markets” and “Installation of energy efficient transformers in a power distribution grid” (16 to 30 July 2015) |
16 Jul 15 |
| Call for public inputs on a proposed JCM project (Viet Nam) “Eco-Driving by Utilizing Digital Tachograph System” (12 June to 11 July 2015) |
12 Jun 15 |
| Electronic Decision by the JC |
31 May 15 |
| Electronic Decision by the JC |
29 Mar 15 |
| 3rd Joint Committee in Hanoi |
14 Jan 15 |
| Call for public inputs on JCM proposed methodologies "Introduction of room air conditioners equipped with inverters to public sector buildings" and "Improving the energy efficiency of commercial buildings by utilization of high efficiency equipment" (5 Dec to 19 Dec 2014) |
05 Dec 14 |
| Call for public inputs on a JCM proposed methodology "Waste heat recovery for electricity generation" (27 Nov to 11 Dec 2014) |
27 Nov 14 |
| Call for public inputs on a JCM proposed methodology "Transportation energy efficiency activities by installing digital tachograph systems" (19 Nov to 3 Dec 2014) |
19 Nov 14 |
| Electronic Decision by the JC |
27 May 14 |
| Electronic Decision by the JC |
23 Apr 14 |
| 2nd Joint Committee in Tokyo |
17 Feb 14 |
| Signing ceremony for adoption of the Guidance for the Implementation and the Rules of Procedures for the Joint Committee & 1st Joint Committee in Hanoi |
18 Sep 13 |
| Japan and the Socialist Republic of Viet Nam signed the bilateral document to start JCM |
02 Jul 13 |