| Category | Rules and Guidelines | Forms |
|---|---|---|
| General | Bilateral Document | |
| Modification of the MoC (as of 7 October 2016) | ||
| Rules of Implementation ver02.0 |
||
| Common Specifications of the JCM Registry ver01.0 | ||
| Project Cycle | Project Cycle Procedure ver02.0 |
|
Guidelines for
Developing Proposed Methodology ver01.0 histories |
|
|
| Guidelines for
Developing Project Design Document and Monitoring Report ver02.0 |
|
|
| Third-Party Entity (TPE) | Guidelines for
Designation as a Third-Party Entity ver02.0 |
|
Guidelines for
Validation and Verification ver01.0 histories |
|
|
| Joint Committee (JC) | Rules of Procedures
for the Joint Committee ver01.0 histories |
*NOTE:
Where a submission including a proposed methodology, PDD and accompanying additional/supporting documents contains
information that the methodology proponents or project participants wish to be treated as confidential or
proprietary, those entities are required to submit documentation in two versions:
(a) One version where all parts containing confidential or proprietary information are made illegible (e.g. by
covering those parts with black ink or overwrite those parts with letters such as “XXX”) so that the version can be
made publicly available without displaying confidential or proprietary information;
(b) Another version containing all information that is to be treated as strictly confidential or proprietary by all
parties handling this documentation (the third-party entities, the Joint Committee members, external experts).