Methodologies Search

 

Total methodologies found:7

Methodology No. Host country Title Status Latest version Date of approval Proposed Methodology No. Methodology Proponent
MM_PM007 Myanmar Introduction of heat recovery system and high efficiency once-through boiler at the beer factory Public inputs closed Kirin Holdings Company, Limited. 20201002 20201016
MM_PM006 Myanmar Introduction of cascade cooling system and/or temperature stratification tank at the beer factory Public inputs closed Kirin Holdings Company, Limited. 20201002 20201016
MM_AM005 Myanmar Power Generation by Waste Heat Recovery in Cement Industry Approved Ver1.0 20 Apr 20 MM_PM005 Institute for Global Environmental Strategies 20200129 20200212
MM_AM004 Myanmar Installation of rice husk power plant in Ayeyarwady region Approved Ver1.0 16 Jan 20 MM_PM004 Fujita Corporation 20190913 20190927
MM_AM003 Myanmar Energy Saving by Introduction of High Efficiency Once-through Boiler Approved Ver1.0 16 Jan 20 MM_PM003 Nippon Koei Co., Ltd. 20190913 20190927
MM_AM002 Myanmar Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Cold Storage Approved Ver1.0 16 Jan 20 MM_PM002 Ryobi Holdings Co., Ltd. 20190913 20190927
MM_AM001 Myanmar Power generation and avoidance of landfill gas emissions through combustion of municipal solid waste (MSW) Approved Ver1.0 25 Jun 18 MM_PM001 JFE Engineering Corporation 20180323 20180406