News :
Call for public inputs on a proposed JCM project (Saudi Arabia) “Introduction of High Efficiency Electrolyzer in Chlor-Alkali Production Plant” (30 January 2018 to 28 February 2018)

30 Jan 18

Call for public inputs on a proposed JCM project (Saudi Arabia) “Introduction of High Efficiency Electrolyzer in Chlor-Alkali Production Plant” (30 January 2018 to 28 February 2018)

The draft PDD was submitted to the secretariat of the Joint Committee for the Joint Crediting Mechanism (JCM) between Saudi Arabia and Japan on 26 January 2018.
The secretariat makes the draft PDD publicly available for public inputs in line with subsection 1.6.1. of the Joint Crediting Mechanism Project Cycle Procedure.

Information on the proposed project (SA001)

All stakeholders are invited to provide their inputs on the proposed project to the following email address sa-pdd-pi@jcm.go.jp only in English, including the following information:
- Name:
- Affiliated Organization:
- E-mail:
- Country:
- Part of the document (A/B/C/etc):
- Page of the document:
- Input on the page:

*NOTE: The secretariat makes all received inputs publicly available unless the TPE determines that the input is unauthentic in line with paragraph 38 of the Joint Crediting Mechanism Project Cycle Procedure.

This call for public inputs is open from 30 January 2018 to 28 February 2018 (24:00 GMT).