Call for public inputs on a JCM proposed methodology "Enhancing carbon removals through afforestation/reforestation" (Philippines) (8 April to 22 April 2026) |
| 07 Apr 26 |
Bangladesh |
Call for public inputs on a JCM proposed methodology “Methane Emission Reduction by Water Management in Rice Paddy Fields in Bogura District and Joypurhat District" (Bangladesh) (8 April to 22 April 2026) |
| 07 Apr 26 |
Thailand |
Call for public comments on proposed JCM projects (Thailand) "Introduction of 0.95 MW Rooftop Solar Power System in Cigarette Lighter Factory" and "Introduction of 0.97 MW Rooftop Solar Power System for Fishery Net Factory" (7 January to 5 February 2020) |
| 07 Apr 26 |
Indonesia |
Decision by the JC |
| 07 Apr 26 |
Indonesia |
Call for public comments on proposed JCM projects (Indonesia) "Installation of Solar Power System and Storage Battery to Commercial Facility" and "Introduction of Absorption Chiller to Chemical Factory" (15 January to 13 February 2020) |
| 07 Apr 26 |
Myanmar |
Electronic Decision by the JC |
| 07 Apr 26 |
Kenya |
4th Joint Committee in Nairobi |
| 07 Apr 26 |
Palau |
Call for public inputs on a proposed JCM project (Palau) "Introduction of 0.4MW Rooftop Solar Power System in Supermarket" (28 January to 26 February 2020) |
| 07 Apr 26 |
Thailand |
Call for public comments on a proposed JCM project (Thailand) "Installation of Co-Generation Plant for On-Site Energy Supply in Motorcycle Factory" (28 January to 26 February 2020) |
| 07 Apr 26 |
Myanmar |
Call for public inputs on a JCM proposed methodology "Power Generation by Waste Heat Recovery in Cement Industry" (Myanmar) (29 January to 12 February 2020) |
| 07 Apr 26 |
Ethiopia |
4th Joint Committee in Addis Ababa |
| 07 Apr 26 |
Philippines |
Electronic Decision by the JC |
| 07 Apr 26 |
Viet Nam |
Call for public inputs on a proposed JCM project (Viet Nam) “Installation of High Efficiency Kiln in Sanitary Ware Manufacturing Factory” (4 February to 4 March 2020) |
| 07 Apr 26 |
Costa Rica |
Call for public inputs on a proposed JCM project (Costa Rica) “Introduction of High Efficiency Centrifugal Chiller and Electric Heat Pump Type Water Heater in Hotel” (14 February to 14 March 2020) |
| 07 Apr 26 |
Thailand |
Call for public comments on JCM proposed methodologies (Thailand) (18 February to 3 March 2020) |